Bodywork Installation

Just one step ahead from touchdown – this time I’ll assemble the air scoops, pulley cover, front fender and chin fairing. Related posts: Stainless Steel Screws Air Scoops These are the tools: 5/32 HEX 3/16HEX TX 27 torque wrench Loctite 243 Loctite 271 Terms and conditions: All work at own risk, NO warranty in ANY case of…

Fork Service (2/2)

Now it’s time to get off the xb12 from the paddock stand – fork and front wheel installation! Related posts: Fork Service (1/2) Front Brakepads These are the tools: 1/4 HEX 5/16 HEX 22 HEX (metric) 22 NUT (metric) plastic wedge torque wrench anti seize Loctite 271 Terms and conditions: All work at own risk, NO warranty in ANY…

Rear Wheel Installation

Finally the rear wheel back in place. Related posts: Rear Wheel Removal Rear Pulley Installation Idler Pulley Installation These are the tools: 5/16 HEX 3/8 HEX 22 HEX (metric) 22 NUT (metric) torque wrench anti seize Loctite 243 Terms and conditions: All work at own risk, NO warranty in ANY case of damage! STEP 1 First…